|
Halbach•Dietz
Architects |
|
Project |
|
Client |
Fort Worth Independent School District |
| Construction Cost | $2,725,000 Budget |
| Construction Schedule |
Fall 2003 |
Services |
Full Architectural, Structural, MEP, and Civil engineering, including schematic design, design development, cost estimating, construction documents and specifications, bidding, construction administration and shop drawing review. |
Project Description
|
The renovations to the existing portion of the building convert the library into classrooms, provide an accessible clinic toilet room and make the circulation more efficient in regards to H/C accessibility. The renovation also includes adding fire walls necessary to bring the building in compliance with current codes and the addition of a wheelchair lift to provide access to the auditorium stage. The new addition contains a 2200 s.f library and fourteen classrooms. Each classroom is equipped with bathrooms, since these are for primary grade students. |