|
Halbach•Dietz
Architects |
|
Project |
|
Client |
|
| Construction Cost | $1,326,100 with alternates |
| Construction Schedule |
Completed November 2000 |
Services |
Full Architectural, Structural, MEP, and Civil engineering, including schematic design, design development, cost estimating, construction documents and specifications, bidding, construction administration and shop drawing review. |
Project Description
|
This project consisted of a single-story branch library for 90,000 volumes. The facility is equipped with an adult and children’s section, a community room for after-hour functions and is equipped with the latest electronic technology. The building was sited and designed for patrons to approach the building through a park-like setting. The walkway is constructed of heavy timber framing and capped with a standing seam metal roof. The exterior palette of split-face block and stone was chosen for compatibility with the character of the Fossil Creek area. The project offers an inviting exterior, a functional interior, and came in under budget.
|