|
Halbach•Dietz
Architects |
|
Project |
|
| Client |
Washington Mutual |
| Construction Cost | $457,131 |
Construction Schedule |
July 1999 |
Services |
|
Project Description |
Using Bank United corporate standards, the new interiors were designed to fit into an existing shopping center end cap space. The new drive-thru lanes were constructed in the location of the existing bank The bank includes a new teller line and work area, a drive-up window with underground pneumatics, a safe deposit vault, a drive-up ATM, and a walk-up depository. Also included are five offices, three for personal bankers and two for loan officers. These offices flank a spacious, vaulted lobby and waiting area.
|